Home Aero Defense UpdateNew Kaan Fighter Prototypes Mark Key Milestone for Turkey.

New Kaan Fighter Prototypes Mark Key Milestone for Turkey.

by Editor
0 comments

Turkey’s next-generation Kaan fighter programme has reached a major development stage with the emergence of its second and third prototypes. The new airframes are expected to begin flight testing in 2026 as Ankara pushes ahead with indigenous engine development.

  • Two new prototypes revealed:
    The P1 and P2 airframes were seen during a high-level visit to Turkish Aerospace Industries facilities.
  • Testing timeline confirmed:
    Both prototypes are scheduled to enter the flight-test phase in 2026.
  • Indigenous engine in progress:
    Turkey is working to replace current U.S.-origin powerplants with a locally developed engine for future variants.
  • Official inspection visit:
    The development was highlighted during the visit of Haluk Görgün, head of the Presidency of Defence Industries.
  • Boost to fifth-generation ambitions:
    The Kaan programme is central to Turkey’s goal of building an advanced, domestically produced stealth fighter.

You may also like

Leave a Comment